Magnus fits out six types of space. Each project is run by one team, from design through to handover.
Workspaces planned around headcount, meeting needs and future growth. We build partitions, ceilings, flooring, lighting, data cabling and HVAC, then finish with bespoke reception and storage pieces from our joinery division. Recent work includes Ask Investment Managers.
Shopfronts, display joinery, lighting and fitting rooms built to brand guidelines and mall fit-out rules. We manage landlord approvals and work within mall programmes, with recent units for Cities at The Dubai Mall and Galleria.
Restaurants, cafés, kiosks and food trucks, including kitchen MEP, extraction, drainage and food-safety-compliant finishes. Recent work includes London Dairy Cafe at Palm Jumeirah and at Sahara Centre, Sharjah, and a London Dairy Cafe food truck.
Gyms, training centres and sports facilities with sports flooring, ventilation, lighting and changing rooms built for heavy daily use.
Villa and apartment interiors and renovations, from layout changes to bespoke joinery, planned to keep disruption to your household to a minimum.
Warehouses and shipping containers converted into offices, showrooms or retail space, complete with the MEP services and finishes they need for everyday use.
Every Magnus fit-out is turnkey. One contract covers everything below, so you never have to coordinate separate trades.
Which authority approves your fit-out depends on where your unit is. Every project starts with a no-objection certificate (NOC) from the landlord or building management. Magnus then prepares the drawings and applications for the authority that covers your location.
| Authority | When it applies |
| Landlord or building management (NOC) | Every project, before any government submission |
| Dubai Municipality | Units in mainland Dubai |
| Dubai Civil Defence | Fire and life safety, on all projects |
| Trakhees | Jebel Ali Free Zone, Palm Jumeirah and other areas it regulates |
| Dubai Development Authority (DDA) | Dubai Media City, Dubai Internet City, Dubai Design District |
| DMCC | Jumeirah Lakes Towers |
| DIFC | Dubai International Financial Centre |
| DEWA | Projects that need extra electrical load, such as restaurants |
| Food safety department / Dubai Health Authority | Restaurant kitchens / medical clinics |
Documents usually needed for the landlord NOC
Standard approvals typically take 5 to 10 working days; projects that need additional approvals can take 3 to 4 weeks (dubizzle, March 2026). Before you open, the authority carries out a final inspection and issues a completion certificate. Planning a clinic? Read our guide to DHA requirements for clinic fit-outs.
A Magnus fit-out runs in eight stages, with one project manager accountable from start to finish.
Aftercare. Support and maintenance as agreed in your contract
A Dubai fit-out has two clocks: approvals and the build. Approvals usually take 5 to 10 working days, or 3 to 4 weeks when extra approvals are needed. Build time then depends mainly on floor area, MEP scope and how much bespoke joinery the design includes.
What usually makes a fit-out take longer
How Magnus keeps your programme on track
One project manager runs the whole programme, and MEP and joinery sit inside the same contract, so there is no waiting on separate subcontractors. Joinery is fabricated while site works progress, not after them. You receive a written programme with your quotation, so the opening date is agreed before work starts.
Fit-out in Dubai is priced per square foot or square metre, and the specification level drives most of the difference. Cushman & Wakefield’s 2026 EMEA Office Fit Out Cost Guide puts the average all-in cost of an office fit-out in Dubai at about USD 181 per sq ft (roughly AED 665), a benchmark that includes furniture, AV, professional fees and contingency. Retail, F&B and residential projects vary more, because kitchens, shopfronts and joinery change the mix.
Cost driver | Why it changes the price |
Floor area | Design, approvals and mobilisation are spread over more square feet on larger projects |
Specification level | Standard finishes cost far less than stone, feature ceilings and premium joinery |
MEP scope | HVAC changes, extra power, kitchen extraction and fire services add cost |
Bespoke joinery | Custom pieces cost more than off-the-shelf furniture but fit the space exactly |
Location and approvals | Mall, free-zone and authority requirements carry their own fees and rules |
Programme | Night work and fast-track schedules raise labour costs |
Magnus prices every project line by line after a site visit, so you can see exactly where the budget goes. Request a fit-out estimate.
Magnus has fitted out cafés, mall units and offices for brands across Dubai and Sharjah.
Because one contractor delivers the fit-out, the MEP and the joinery, one team is accountable for the whole result.
An interior fit-out is the work that makes an empty or existing space ready to use: partitions, ceilings, flooring, lighting, MEP services, joinery and finishes. In Dubai it also includes landlord and authority approvals before work starts and an inspection before the space opens.
Shell and core is the bare building. Category A adds the base finishes landlords usually provide: raised floors, suspended ceilings, basic lighting, HVAC and fire services. Category B is the tenant's own fit-out: partitions, meeting rooms, pantries, branding, furniture and specialist MEP.
Yes. Magnus delivers turnkey fit-outs under one contract, covering design development, approvals, civil works, MEP, joinery, finishes, testing and handover. You deal with one project manager from site visit to completion
Offices, retail stores, restaurants and cafés, sports facilities, homes, showrooms, and warehouse or container conversions across Dubai and Sharjah. Recent projects include London Dairy Cafe at Palm Jumeirah and Cities at The Dubai Mall.
Yes. Recent mall projects include The Dubai Mall, Galleria and Sahara Centre in Sharjah. We handle the landlord's fit-out approvals and work within each mall's rules on working hours and deliveries.
Yes. We build from your interior designer's or consultant's drawings, or develop the design with you. We review the drawings for MEP coordination and approval requirements before pricing, so problems are solved on paper rather than on site.
Yes. We prepare and submit fit-out approvals, starting with the landlord NOC and then the authority that covers your location, such as Dubai Municipality, Dubai Civil Defence, Trakhees, DDA, DMCC or DIFC
Yes. HVAC, electrical, plumbing and drainage, and data cabling are part of our fit-out scope. Our MEP team designs and installs them, coordinated with ceilings and joinery from the start. See our MEP services in Dubai.
Yes. Our joinery division designs and fabricates bespoke joinery, furniture and finishes for each project, from office furniture to décor pieces and decorative lighting. See our joinery services.
Yes. Each project has a dedicated project manager and site supervisor who run the programme, coordinate trades, check quality at each stage and keep you updated throughout.
Yes. Before handover we test and commission MEP systems, walk the site with you to list snags, close them, and support the final authority inspection needed before you open.
We provide aftercare and maintenance as set out in your contract. The same project team stays your point of contact.
Send your location, floor area, space type and target opening date by WhatsApp or call +971 55 288 7962, or email connect@magnus.ae. We arrange a site visit and send an itemised quotation.
Ready to transform your space? Get in touch with us today and let’s discuss your vision.
P.O. Box 42080
Jebel Ali Dubai, U.A.E
© 2025 Magnus.ae, All rights reserved.